::About | ::CCHP Technology | ::Core Business | ::Achievement | ::R&D |  ::Financing | ::Contact
·Signature for the Consulting Service Contract    2007-08-01
·CCHP Investigation Group of NPC    2007-02-09
·The CCHP project for Beijing South Railway Station    2006-08-28
·BGG CCHP Project Heating Season Report    2006-08-28
·The 2nd China DE seminar    2006-08-28
·ISO9000:2000 Authorization    2006-08-28
·BGG CCHP Project’s Winter Season Operation    2006-08-28
·Preliminary Examination ISO 9001    2006-08-28


[Achievement]

Control Center Building of Beijing Gas Group (BGG)
    BGG building occupies an area of 32800 m 2 . Invested by BGG, CCHP project for Control Center Building is in sound operation since commissioning in August, 2004. This project adopts gas engine power generation unit, and the models are respectively G3508 (480 kw), and G3512 (725kw). These engines work with BZHR100VIII (1 million Mega Pascal) and BZHR200VIII (2 million Mega Pascal) waste heat DFA. Energy-Net is responsible for construction management, system integration, operation management, maintenance, and corresponding evaluation studies. At present, this CCHP system, the demonstration project of BGG's application of nature gas is under sound and reliable operation thanks to Energy-Net's superior professional operation management.



Achievement
    1.Control Center Building of Beijing Gas Group (BGG)
        2.Ciqu Pump Station
        3.Zhongguancun Software Park
        4.Phase III, China World Trade Center (CWTC)
        5.ShenZhen GuangMing Technique Park

        6.ZhongGuanCun Medical Park


 
© 2006 Beijing Energy-Net DE Co.,Ltd